Instructions / Assembly
EZ-MAX Plus Installation Guide Page 5
Inspection
Carefully unpack the relay cabinet, and inspect to make sure there is no hidden
shipping damage. Report any damage to the freight carrier who delivered the system.
Claims for damages are filed with the freight carrier.
In case of damaged components, your relay cabinet may be serviced in the field with
factory replacement parts.
Installation Overview
Follow the steps below to install a remote relay cabinet:
Step 1: Mount the relay cabinet to the wall, install conduit, and pull all wire
(See “Relay Cabinet Mounting” on page 7.).
Step 2: Terminate line voltage wiring (See “Line Voltage and Control Power
Termination” on page 15.).
Step 3: Terminate any low voltage discrete input wiring (See “Low Voltage” on
page 23.).
Step 4: Terminate any network wiring (See “Wiring the Phoenix Connector” on
page 40.).
Step 5: Inspect your work (REQUIRED FOR ALL CABINETS) (See “Power-Up
and Installation Verification Checklist” on page 1.).
Step 6: Power-up and test the system.
Step 7: Install latest software/firmware from Leviton website,
www.leviton.com/lms.
Step 8: Perform all necessary configuration. (See the EZ-MAX Plus
Programming Guide)
Each of the above steps is covered in detail throughout the rest of this installation
guide. Each section contains notes, warnings, requirements, suggestions, and
procedures that will help you successfully install and use your system.