Installation
Installation Checklist
Follow these simple steps to install the cabinet:
Step 1: Unpack the system.
Step 2: Report any damage to the freight carrier.
Step 3: If appropriate, remove any covers and/or doors.
Step 4: If appropriate, remove the mounting plate assembly and store where
damage will not occur to the electronics.
Step 5: Attach the cabinet to the wall (reference stickers inside the cabinet for
proper orientation if it is in question).
Step 6: Drill conduit entry holes if KO’s are not provided and attach conduit
where appropriate.
Step 7: Pull all wire into the cabinet.
Step 8: Test and verify all wiring by directly connecting line to load. Correct any
faults and re-test wiring before you proceed.
Step 9: If applicable, re-install any control electronics removed in Step #4.
Step 10: Terminate discrete input control wiring.
Step 11: Terminate network control wiring.
Step 12: Test each Line/Load circuit for shorts.
Step 13: Terminate the feed and load wiring to each relay.
Step 14: Blow out dust, dirt, or debris which has accumulated in the cabinet.
Step 15: Apply power to the system.
Step 16: Verify proper operation of each relay using the override buttons.
Step 17: Configure cabinet per owner’s requirements.