FAQ

56
continued from page 55
or locker rooms with showering facilities, as they
represent similar hazards.
This revision recognizes the diculty of accessing
occupied bathrooms.
Supplemental overcurrent devices are allowed.
Examples of supplemental overcurrent devices are
identified in illustration below.
Leviton Solution
See for yourself why The
Award-Winning Leviton
Load Center has been called
a breakthrough in Load Centers.
First — Faster Installation —
Wire the entire panel at
rough-in, without a single circuit
breaker present. The Leviton
Load Center’s all plug-on design
increases job site eciency
and provides ample room
for hands to move
and work freely.
It’s also the industry’s
first intelligent residential
circuit breaker system with
optional Smart Circuit Breakers.
Then the My Leviton app consolidates control of the
Leviton Load Center’s smart circuit breakers and the
Decora Smart
®
Wi-Fi
®
product lines, enabling users to
seamlessly control load center activities and home
lighting from anywhere in the world using
their smartphone or tablet.