User's Manual Part 5

STAREX-IS BSM Manual
Page:486(877)
Issue:1.
0
SMD-011-PMA210
Fig. 4.6-28 SCCP Timer Change
4.6.3. Maintenance Function Command
4.6.3.1. Signaling Link Test
Signaling Link Test is performed while Signaling Link is in service when Signaling Link
becomes activated or restored and is used to check if both ends of Signaling Link
process messages correctly. The status of Signaling Link to be tested should be in the
Activate Status.
Command TEST-SLK:BSC_ID=a, SLC =b;
a = BSC Number ( 0 ~ 11 )
b = Signalling Link Code ( 0 ~ 15 )
Input TEST-SLK:BSC_ID= 0, SLC = 1;
Output