Installation Guide

22 INSTALLATION
Four-Wire Power Cord
A 4-wire connection is required for
all mobile and manufactured home
installations, as well as all new
construction after January 1, 1996.
A UL-listed strain relief is required.
Use a 30-amp, 240-volt, 4-wire,
UL-listed power cord with #10 AWG-
minimum copper conductor and closed
loop or forked terminals with upturned
ends.
Remove the terminal block access cover on the
1
upper back of the dryer.
Install a UL-listed strain relief into the power
2
cord through-hole.
Thread a 30-amp, 240-volt, 4-wire, UL-listed
3
power cord with #10 AWG-minimum copper
conductor through the strain relief.
Terminal Block
UL-Listed Strain Relief
UL-Listed 4-Wire Power
Cord
Transfer the dryer’s ground wire from behind the
4
green ground screw to the center screw of the
terminal block.
Attach the two hot leads of the power cord to the
5
outer terminal block screws.
Attach the white neutral wire to the center screw
6
of the terminal block.
Attach the power cord ground wire to the green
7
ground screw.
Tighten all screws securely.
8
Reinstall the terminal block access cover.
9
Hot (Black) Neutral (White)
Hot (Red)
Ground Screw
White Wire moved from
Ground Screw
Power Cord Ground
Wire