Installation guide
ENGLISH
Installation Manual 23
Refrigerant piping Installation
Precautions on Pipe connection / Valve operation
Refrigerant piping Installation
Low Pressure
Gas pipe
Liquid pipe
High Pressure
Gas pipe
Pipe connection is done by connecting from the end of the pipe to
the branching pipes, and the refrigerant pipe coming out of the
outdoor unit is divided at the end to connect to each indoor unit.
Flare connection for the indoor unit, and welding connection for
the outdoor pipe and the branching parts.
• Use hexagonal wrench to open/close the valve.
WARNING
• Always careful not to leak the refrigerant during welding.
• The refrigerant generates poisonous gas harmful to human body if combusted.
• Do not perform welding in a closed space.
• Be sure to close the cap of the service port to prevent gas leakage after the work.
CAUTION
Please block the pipe knock outs of the front and side panels after installing the pipes.
(Animals or foreign objects may be brought in to damage the cables.)










