Owner's Manual

EN
19
INSTALLATION
Wall
drilling
and
bracket
fixing
Wall
marking:
?
Draw
a
vertical
line
on
the
supporting
wall
up
to
the
ceiling,
or
as
high
as
practical,
at
the
centre
of
the
area
in
which
the
hood
will
be
installed.
?
Draw
a
horizontal
line
at
650
mm
above
the
hob.
?
Place
bracket
7.2.1
on
the
wall
as
shown
about
1-2
mm
from
the
ceiling
or
upper
limit
align-
ing
the
centre
(notch)
with
the
vertical
reference
line.
?
Mark
the
wall
at
the
centres
of
the
holes
in
the
bracket.
?
Place
bracket
7.2.1
on
the
wall
as
shown
at
X
mm
below
the
first
bracket
(X
=
height
of
the
upper
chimney
section
supplied),
aligning
the
centre
(notch)
with
the
vertical
line.
?
Mark
the
wall
at
the
centres
of
the
holes
in
the
bracket.
?
Mark
a
reference
point
as
indicated
at
116
mm
from
the
vertical
reference
line
and
306
mm
above
the
horizontal
reference
line.
?
Repeat
this
operation
on
the
other
side.
?
Drill
ΓΈ
8
mm
holes
at
all
the
centre
points
marked.
?
Insert
the
wall
plugs
11
in
the
holes.
?
Fix
the
lower
bracket
7.2.1
using
the
12a
screws
(4,2
x
44,4)
supplied.
?
Fix
the
upper
bracket
7.2.1
and
the
air
outlet
connection
support
7.3
together
using
the
2
screws
12a
(4,2
x
44,4)
supplied.
?
Insert
the
two
screws
12a
(4,2
x
44,4)
supplied
in
the
hood
body
fixing
holes,
leaving
a
gap
of
5-6
mm
between
the
wall
and
the
head
of
the
screw.