Multi F Engineering Manual

Horizontal Installation
• Units must be installed so that the access panels face to the side, 
not facing up or down. 
• Installation must be in accordance with all relevant building codes, 
which will necessitate the installation of an external condensate 
pan (position the unit in or above the external condensate pan). 
• If the units are going to be suspended, use angled steel support 
brackets with threaded rods to provide support from the bottom. 
The brackets / threaded rods must be comparatively bigger / longer 
than the unit, and each must be centered on the part of the frame 
it supports. 
• If the unit will not be suspended, still use angled steel support 
brackets, but also add vibration isolators (field supplied) to avoid 
sound transmission. If necessary, provide the installing contractor 
with an illustration of where the vibration isolator must be added 
and how it must be positioned. 
• Unit must be positioned properly for plenum / duct installation. 
• Plenum must be strong and secure enough to support the installa-
tion of adapter collars to accommodate duct work.
To ensure proper drainage for horizontal installations, unit must be installed within ±1/8 inches level of the unit’s length and width.
9HUWLFDO+RUL]RQWDO$LU+DQGOLQJ8QLWVFDQEHLQVWDOOHGLQDFKRLFHRIYHUWLFDOXSÀRZRUKRUL]RQWDOOHIWVLGHFRQ¿JXUDWLRQV
Vertical (Upflow) Installation 
• Unit must be positioned properly for plenum / duct installation. 
• To maintain proper air flow, minimum height clearance is 14 inches. 
• Plenum must be strong and secure enough to support the installation of adapter collars to accommo-
date duct work. 
• Air handler platform must be sturdy enough to support the frame, plus any accessories (e.g., filter box). 
• To prevent air leaks, seal all duct work according to local codes, but make sure that filter access is still 
unobstructed. 
• Vibration isolators (field supplied) must be installed between the unit frame and the platform. If neces-
sary, provide the installing contractor with an illustration of where the vibration isolator must be added 
and how it must be positioned. 
'RQRWLQVWDOOWKHVFUHZVRQWKHIURQWDQGEDFNRIWKHXQLWGRLQJVRZLOOEORFN¿OWHULQVWDOODWLRQ
Use > 6 Screws (M4*25L)
Field Supplied
Return Air Duct /
Plenum
>1 inch
Field Supplied 
Supply Air Duct
)LJXUHVertical Installation / 
Attaching the Bottom Duct.
B
A
C
>1-1/2 inch x 1-1/2 inch Angle 
Recommended length >26 inches 
with a 2-inch clearance on both
sides of the unit
>3/8 inch Threaded Rod
Field-Supplied 
Supply Air Duct
Field Supplied 
Return Air Duct / Plenum
Suspension Bolt Locations
Capacity 
(Btu/h)
Dimensions (inches)
ABC
24,000
4 23 41-11/32
36,000
)LJXUHHorizontal Installation.
7DEOHBracket / Bolt Position Dimensions.
TWO-WAY VAHU INDOOR UNITS
Installation and Best Layout Practices
'XHWRRXUSROLF\RIFRQWLQXRXVSURGXFWLQQRYDWLRQVRPHVSHFL¿FDWLRQVPD\FKDQJHZLWKRXWQRWL¿FDWLRQ 
©/*(OHFWURQLFV86$,QF(QJOHZRRG&OLIIV1-$OOULJKWVUHVHUYHG³/*´LVDUHJLVWHUHGWUDGHPDUNRI/*&RUS
150 |  VERTICAL-HORIZONTA L
Multi F and Multi F MAX Indoor Unit Engineering Manual
MULTI 
F
MAX
MULTI 
F