Multi F Installation Manual

19
General Installation Guidelines
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
MULTI
F
MAX
MULTI
F
Bolt
Refrigerant Pipe
Connection Location
Top of Outdoor Unit
(Looking Down)
Bolt
Bolt
Bolt
Bolting the Outdoor Unit to the Platform
1. Ensure that the concrete platform will not degrade easily, and has enough
strength to bear the weight of the unit.
2. Include an H-beam support. Firmly attach the corners, otherwise the support
will bend.
3. Use a hexagon nut.
4. Use anti-vibration material.
5. Include enough space around the concrete foundation for condensate
drainage.
6. Seal all wiring and piping access holes to prevent bugs from entering the
unit.
Outdoor Unit Foundation Requirements.
Figure 4: LMU18CHV and LMU24CHV Outdoor Units.
Minimum
8
7-7/8
15-3/4
Minimum 24-13/32
Unit: Inch
Outdoor Unit Type
Bolt
Type
Concrete Height Bolt Depth
LMU18CHV, LMU24CHV,
LMU30CHV, LMU36CHV
M10-J Minimum 4 inches Minimum 3 inches
LMU480HV, LMU540HV,
LMU600HV
M10-J Minimum 8 inches Minimum 3 inches
Table 8: 2XWGRRU8QLW)RXQGDWLRQ6SHFL¿FDWLRQV
Figure 5: LMU30CHV and LMU36CHV Outdoor Units.
Minimum
3-15/16
21-1/2
Minimum 14-9/16
Unit: Inch
Outdoor Unit Platform Requirements
Figure 6: LMU480HV, LMU540HV, LMU600HV Outdoor Units.
Figure 7: Bolting the Outdoor Unit to the Platform (Piping
Location May Differ Depending on Outdoor Unit Model).
Minimum
3-15/16)
21-1/2
Minimum 14-9/16
Unit: Inch
GENERAL INSTALLATION GUIDELINES
Platform Instructions for Outdoor Unit