Flaring Work and Connection of Piping
Align the center of the piping and sufficiently
tighten the flare nut by hand.
Connecting pipe order
1) A~D-UNIT gas side pipe
2) A~D-UNIT liquid side pipe
Finally, tighten the flare nut with torque wrench
until the wrench clicks.
• When tightening the flare nut with torque
wrench ensure the direction for tightening fol-
lows the arrow on the wrench.
Main gas
side valve
Main liquid
side valve
Gas side piping
Liquid
side piping
A-UNIT
B-UNIT
C-UNIT
D-UNIT
Outdoor unit(36 kBtu/h class)
Connection of piping - Outdoor
(Only Indoor Units
18 kBtu/h class )
Outside diameter Torque
mm inch N. m kgf.m lbf.ft
Ø6.35 1/4 14~18 1.4~1.8 10~13
Ø9.52 3/8 34~42 3.5~4.3 25~31
Ø12.7 1/2 49~61 5.0~6.2 36~45
Ø15.88 5/8 69~82 7.0~8.4 51~60
Ø19.05 3/4 100~120 10.0~12.2 73~88