Concealed Duct Installation Manual

ENGLISH
7
INSTALLATION
Install the air conditioner in the location that satisfies the following conditions.
- The place shall easily bear a load exceeding four times the indoor unit’s weight.
- The place shall be able to inspect the unit as the figure.
- The place where the unit shall be leveled.
- The place shall easily connect with the outdoor unit.
- The place where the unit is not affected by an electrical noise.
- The place where air circulation in the room will be good .
- There should not be any heat source or steam near the unit
Confirm the positional relationship between the unit and suspension bolts.
- Installation the ceiling opening to clean the filter or service under the product.
[Unit:mm(inch)]
A(Min)
Ceiling
Service Space
A
B
B(Min)
H=20 (25/32)
or more
• Suitable dimension "H" is necessary to
get a slope to drain as shown in the figure
Side view [Unit: mm(inch)]
Air outlet
Inspection hole
600 x 600
(23-5/8 x 23-5/8)
Control box
600
(23-5/8)
600
(23-5/8)
Top view [Unit: mm(inch)]
Air outlet
Indoor unit
Capacity (kBtu/h)
A B
9
800 (31-1/2) 800 (31-1/2)
12/18
800 (31-1/2) 1 000 (39-3/8)
INSTALLATION
20(25/32) or more
Top view
(unit: mm(inch))
Front view
Front
Inspection hole
600(23-5/8) X 600(23-5/8)
Control box
1 000
(39-3/8)
600(23-5/8) 600(23-5/8)
Make sure to be materials in a compartment handling air for circulation through a duct
supplying only one room.
WARNING
!