Install Instructions

Mounting the Control Panel
1. Determine mounting location for panel. If distance
exceeds the length of either the float switch
cables or the pump power cables, splicing will
be required. For outdoor or wet installation, we
recommend the use of an SJE-Rhombus
®
liq-
uid-tight junction box with liquid-tight connectors
to make required connections. You must use
conduit sealant to prevent moisture or gases
from entering the panel.
2. Mount control panel with mounting devices fur-
nished.
3. Determine conduit entrance locations on control
panel.
NOTE: Be sure the incoming power, voltage, am-
perage, and phase meet the requirements of the
pump motors being installed. If in doubt, see the
pump identification plate for electrical require-
ments.
4. Drill proper size holes for type of connectors be-
ing used.
NOTE: If using conduit, be sure that it is of ad-
equate size to pull the pump and switch cables
through.
5. Attach cable connectors and/or conduit connec-
tors to control panel.
FOR INSTALLATION WITHOUT A SPLICE,
GO TO STEP 10; FOR INSTALLATION RE-
QUIRING
A SPLICE, FOLLOW STEPS 6-9.
6. Determine location for mounting junction box ac-
cording to state and local code requirements.
Mount the junction box to proper support.
7. Run conduit to junction box. Drill proper size holes
for the type of conduit used. Attach connectors
to junction box.
Installation InstructionsInstallation InstructionsInstallation InstructionsInstallation InstructionsInstallation InstructionsInstallation InstructionsInstallation InstructionsInstallation InstructionsInstallation Instructions
8. Identify and label each wire before pulling through
conduit into control panel and junction box. Make
wire splice connections at junction box.
9. Firmly tighten all fittings on junction box.
10. If a junction box is not required, pull cables
through conduit into control panel.
11. Set motor protective switches:
a) set the dials to match motor full load amps.
b) turn dial on motor protective switch to the ON
position.
NOTE: Resetting the dial with power applied to
the motor protective switch could start the motor.
12. Connect pump wires directly to the motor
contactors terminal positions T1, T2, and T3.
NOTE: Three-phase motors will run in either di-
rection. Check pump motor before installation for
proper rotation. To correct rotation, change pump
cable connections on any two terminals T1-T2-
T3.
13. Connect “power-in” conductors to proper loca-
tions: 208/240/480 VAC on the 3 position termi-
nal block. Install tagged factory wire to appro-
priate transformer primary voltage tap.
VERIFY CORRECT OPERATION OF CON-
TROL PANEL AFTER INSTALLATION IS
COMPLETE.