Installation and Operation Guide

14
Unit Venting
Donotrestricttheairow.
The ventilation opening can either be directly over the appliance
1
, above the cabinet and below the ceiling
2
or through a vent
installedinasot
3
.
IMPORTANT
The clear ventilation cross-section must be at least
200 cm² from the lower ventilation opening right to
the upper one.
The section below the freezer door and the oor
must not be covered.
5 mm socket
22 mm
wrench
IMPORTANT
After nal installation, this screw must be turned
down until it has proper oor contact to support the
hinge bracket.
The height can be adjusted in
front by twisting the leveling
feet.
Twist the adjusting bolt to set up the
back of the appliance. Align the appli-
ance with sides of kitchen cabinets by
adjusting leveling feet and the supports.
Leveling the Appliance