User guide
8 HS 8070 HD
Load chart for duty cycle operation (main boom No. 1311.18)
20 t counterweight
Maximum capacity in duty cycle operation with standard ropes
Line pull (1st layer) kN 120 160 200
Rope diameter mm 24 26 30
Minimum breaking load kN 517 615 846
Line pull - 1-rope duty cycle operation t 12 16 20
Line pull - 2-rope duty cycle operation
1)
t 18.2 24.2 30.3
1) Lifting a load exceeding the line pull of one winch is only allowed
if it can be ensured that each individual winch is not overloaded.
When working with a mechanical 2-rope grab the total load
to be lifted is limited by the line pull of one winch.
Rigging and ropes are part of the load.
2) Max. capacities in metric tonnes do not exceed 75% of
tipping load. Crane standing on firm, horizontal ground.
Capacities in duty cycle operation are for reference only and are not programmed in the LMI system.
All loads and counterweight configurations are max. values and must not be exceeded.
Weight of additional equipment on boom (e.g. walkways, hose drums etc.) must be deducted to get the net capacity.
Capacities in metric tonnes for boom lengths (11 m - 32 m) - with 200 kN winches
Boom length (m)
Radius 11 14 17 20 23 26 29 32 Radius
(m) t t t t t t t t (m)
5.3 24.5 5.3
6 29.9 30.3 28.5 24.5 21.0 6
7 29.8 29.0 28.1 27.6 27.2 24.5 21.0 7
8 24.5 24.6 24.6 24.6 24.3 23.5 22.7 21.0 8
9 20.8 20.8 20.9 20.8 20.8 20.6 19.6 18.5 9
10 18.0 18.1 18.1 18.0 18.0 17.7 17.3 16.3 10
12 14.1 14.1 14.1 14.1 13.7 13.2 12.8 12
14 11.5 11.5 11.5 11.4 11.1 10.9 10.6 14
16 9.6 9.6 9.6 9.5 9.4 9.2 16
18 8.2 8.2 8.1 8.1 8.0 18
20 7.0 7.1 7.0 7.0 6.9 20
22 6.2 6.1 6.1 6.0 22
24 5.4 5.4 5.3 24
26 4.7 4.7 26
28 4.2 4.1 28
30 3.7 30
TLT 10538259 M00000 Vorab3