User Manual

8 HS 8100 HD
Maximum capacity in duty cycle operation with standard ropes
Line pull (1st layer) kN 160 200 250
Rope diameter mm 26 30 34
Minimum breaking load kN 615 846 1046
Line pull - 1-rope duty cycle operation t 16 20 25
Line pull - 2-rope duty cycle operation
1)
t 24.2 30.3 37.9
1) Lifting a load exceeding the line pull of one winch is only allowed
if it can be ensured that each individual winch is not overloaded.
When working with a mechanical 2-rope grab the total load
to be lifted is limited by the line pull of one winch.
Rigging and ropes are part of the load.
2) Max. capacities in metric tonnes do not exceed 75% of
tipping load. Crane standing on firm, horizontal ground.
Load chart for duty cycle operation (main boom No. 1311.22)
26.3 t counterweight
Capacities in duty cycle operation are for reference only and are not programmed in the LMI system.
All loads and counterweight configurations are max. values and must not be exceeded.
Weight of additional equipment on boom (e.g. walkways, hose drums etc.) must be deducted to get the net capacity.
Capacities in metric tonnes for boom lengths (11 m - 32 m) Counterweight 26.3 t
Boom length (m)
Radius 11 14 17 20 23 26 29 32 Radius
(m) t t t t t t t t (m)
4.2 28.2 4.2
5 37.9 34.6 28.2 23.5 5
6 37.9 37.9 37.9 37.6 37.9 34.6 28.2 23.5 6
7 37.7 37.9 36.5 36.0 34.6 34.4 28.2 23.5 7
8 34.4 33.5 33.0 32.1 30.6 28.9 26.2 23.5 8
9 28.9 28.5 27.6 27.1 26.1 25.1 22.8 21.0 9
10 24.5 24.0 23.3 22.6 22.1 21.3 20.4 18.7 10
12 17.9 17.6 17.3 16.9 16.3 16.0 15.3 12
14 15.0 14.8 14.4 14.1 13.7 13.3 12.9 14
16 12.7 12.4 12.1 11.8 11.4 11.2 16
18 10.8 10.6 10.3 10.0 9.7 18
20 9.6 9.3 9.1 8.8 8.6 20
22 8.3 8.1 7.8 7.5 22
24 7.1 7.0 6.7 24
26 6.2 5.9 26
28 5.4 5.3 28
30 4.7 30
TLT 11221530 M00000 Vorab3