Operation Manual
10
3. Install the Right/Left Handrail Arms, Right/Left
Foot Bars, Right/Left Foot Pedals, and Foot
Bar Covers-A/B.
Remove two M10x18 Bolts (40), Ø18xØ10x2 Spring
Washers (41), Ø10 Big Washers (90), and Ø28x5
Washers (42) from the left and right horizontal axes
of the Front Post (5). Then attach the Left Handrail
Arm (3L) onto the left horizontal axis of the Front
Post (5) with one M10x18 Bolt (40), Ø18xØ10x2
Spring Washer (41), Ø10 Big Washer (90), and
Ø28x5 Washer (42) that were removed. Install a
S16 Cap (46) onto the M10x18 Bolt (40).
Attach the left U-Shape Bracket (20) to the left Crank
(75) with one 1/2” Bolt for left U-Shape Bracket (13L),
Ø28xØ17x0.3 Wave Washer (15), Ø12 Spring
Washer (17), and 1/2” Left Nylon Nut (14L). Install a
S13 Cap (28) onto the M8x50 Bolt (23).
NOTE: 1/2” Bolt for left U-Shape Bracket (13L) and
1/2” Bolt for right U-Shape Bracket (13R) are marked
with “L” and “R”.
Attach the Left Foot Pedal (33) onto the Left Foot Bar
(2L) with three M6x40 Bolts (26), Ø6 Washers (25),
and M6 Nylon Nuts (24).
Attach the Foot Bar Covers-A/B (30L, 30R) onto the
Left Foot Bar (2L) with two ST4.2x25 Phillips Self
Tapping Screws (63).
Repeat above step to attach the Right Handrail Arm
(3R) onto the right horizontal axis of the Front Post
(5) and right U-Shape Bracket (20) to the right Crank
(75).
4. Install the Right and Left Handrails.
Attach the Right/Left Handrails (4R, 4L) onto the
Right/Left Handrail Arms (3R, 3L) with four M6x35
Bolts (44), Ø6 Curve Washers (45), and M6 Cap
Nuts (47).
3L
63
2L
25
24
33
26
28
23
63
30L
30R
2R
48
42
40
41
46
3R
5
14L(R)
15
13L(R)
17
75
6
7
8
90
3
4R
3R
5
3L
4L
47
45
44
44
45
47
6
7
8
4










