Installation Guide

3
January1,2020
Pleasecontact800-273-1143forfurtherassistance.
G H I
J
D E F
D. CrawlSpaces:Concreteslaborgroundmustbedry.Ensurethatcrawlspaceshaveopenventsyear-
roundtoensureproperaircirculationandpreventmoisturebuild-up.Thegroundinthecrawlspacesmust
be completely covered using 6 mil polyethylene. Crawl space clearance between the earth and underside
ofjoistsshouldbenolessthan18"(45.7cm)andtheperimeterventareashouldbeequalto1.5%ofthe
total square footage of the crawl space or as mandated by code.
E. Carefullyremoveanyexistingquarterroundorbaseboardmolding.
F. Always remove carpet, carpet pad and tack strips.
G. Removeanyexistingoatingorun-adheredooring.
H. Besurethesurfaceofthesuboorisat,clean,dryandsoundbeforestarting.
I. Inspect every plank for any shipping damage when removing from the carton.
J. Kitchencabinetsmustbeinstalledbeforetheoorisinstalled.DonotinstallcabinetsontopofLifeProof
Vinyl Plank.