User's Manual

7
Bring two of the assembles completed in steps 1 and 2 together as shown in the image below.
Place a Red Tube (A) over the Blue Tubes (B) and secure the Red and Blue Tubes together at
the top joint as shown below by placing a 1 3/4” Bolt (HA) through Washer (HE) then through
the Blue Tubes (B) and Red Tube (A). Place a Washer (HE) over the 1 3/4” Bolt (HA) and
Finger tighten Standard Nut (HD) for removal later.
The Geo-Dome should be stood upright to complete this step and the rest of the assembly.
3
Attach a Blue Tube (B) to tubes 1 and 2 at the bottom of each
assembly completed in the previous step (joint a). Slide a 3/4” Bolt
(HB) through a Thin Washer (HE) and the two Blue Tubes (B). Place
a Washer (HE) over the 3/4” Bolt (HB) and Finger tighten Nylock
Nut (HC) for removal later. Follow the same assembly for
(joint b)
and repeat this step on all ve assemblies.
2
B
B
HB
HE
HC
B
joint a
joint b
Ground
Ground
HE
HD
HA
HE
HE
Two Adults
Required for
Assembly
A
1
3
2
4
6
5
B
B