Instructions / Assembly

TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
14
SEC
$FOUFSUIFJ-Bolt Template (AKT)PWFSUIFIPMFThe front
of the Template is the side with the Nut Coupler (CYV) and
should be toward the playing surface.
*OTFSUUIFJ-Bolts (AEI)JOUPUIFDPODSFUFBOEBHJUBUFUIF
5FNQMBUFBTTFNCMZUPFMJNJOBUFBOZBJSCVCCMFT
1VTIUIF+#PMUTJOUPUIFDFNFOUVOUJMUIF5FNQMBUF
JTSFTUJOHnBUBHBJOTUUIFDFNFOU'PSNUIFDFNFOU
JOUPBEPXOXBSETMPQFUPXBSEUIFQMBZJOHTVSGBDF
to allow water runoff. The lower four 5/8” Hex Nuts (AER)
and the Nut Coupler will be in the concrete permanently.
$MFBOPGGBOZDPODSFUFPOUIF+#PMU5FNQMBUFPSUIF
FYQPTFEQPSUJPOPGUIF+#PMUT6TJOHBDBSQFOUFST
MFWFMNBLFTVSFUIF5FNQMBUFJTTRVBSFUPUIFQMBZJOH
TVSGBDF1MBUFTIPVMECFMFWFMBOEBCPVUwBCPWF
UIFQMBZJOHTVSGBDFGPSXBUFSUPESBJOPGGPGUIFTUFFM
1
*GZPVBSFVTJOHDPODSFUFNJYNJYUIFDPODSFUF
BDDPSEJOHUPUIFJOTUSVDUJPOTPOUIFCBHTPlease
note that a thicker mix of concrete will dry stronger.
1PVSUIFDPODSFUFJOUPUIFIPMFTUPQQJOHBCPVU
JODIFTGSPNUIFUPQPGUIFIPMF
1VTIUIFGPVSQJFDFTPG36” Rebar (AEZ)mSNMZUPUIF
CPUUPNPGUIFIPMF5IF3FCBSTIPVMECFBSSBOHFE
JOBTRVBSFBCPVUJODIFTXJEFJOUIFDFOUFSPG
UIFIPMFTPFBDIQJFDFXJMMCFOFYUUPUIF+#PMUT
XIFOUIFZBSFQMBDFEJOUIFDFNFOU
'JOJTImMMJOHUIFIPMFUPUIFUPQXJUIDPODSFUF5IF
UPQPGUIFDPODSFUFTIPVMESFBDIBCPVUwBCPWF
UIFQMBZJOHTVSGBDFBOETMPQFEPXOUPXBSEUIF
QMBZJOHTVSGBDFUPBMMPXXBUFSSVOPGG
SEC
1.3
SEC
1.4
(Not to scale)
AKT
18”
AEI
CYV
AER
Playing surface
Note: You are now finished with the initial assembly steps. DO
NOT PROCEED WITH THE ASSEMBLY until the concrete has fully
cured. Curing will take a minimum of 72 hours (3 days). In
humid climates or wet weather, allow additional time for the
concrete to cure. Never use the system without first following
the cementing instructions.
!
AEZ
MC#BHY
NO HARDWARE REQUIRED FOR THIS PAGE