Installation Guide
Toilet and Pump Installation
Check the following before starting installation:
Floor site should be finished and level.
Check for clearance of doors and cabinets as well as any shower enclosure.
Ensure that all plumbing and electrical fixtures do not interfere with placement of
bathroom fixtures.
Rough plumbing and electrical are completed to code.
Placement of the electrical outlet must also meet local code. It is recommended to
leave a 40” distance from bathtub/shower and within 6’ of the pump.
Drill the floor holes for toilet
placement. If installing on a concrete floor, install
anchors,
but DO NOT permanently secure fixtures until instructed.
Concrete Floor Installation: Wood Floor Installation:
Using Anchors:
Drill 2 holes using a ½” masonry drill bit;
then insert the provided screws.
Using Only Screws:
Drill 2 pilot holes using a ¼” drill bit.
IMPORTANT: Do not plug the macerator into an extension cord, for this is a safety
hazard and can cause injury.
Caution: To permit proper drainage it is essential to elevate the shower/tub drain to a
minimum of 9” above the finished floor of the installed pump. If necessary, re
member to
adjust the height of the shower/tub drain upwards to allow proper grade for the plumbing
connection to the pump. It is important to plan accordingly.