User Guide

18 Installation
Doc 01-G0547
Rev D
POST MOUNTING: SL580 ONLY
1 Locate and secure two posts, 3” O.D.
heavy wall pipe.
2 Remove the mounting angles from base
of power unit. Use the angles to maintain
the proper distance between posts.
Secure the angles to the posts using U-
bolts.
3 Check that:
ü Each post is the same distance
from the gate.
ü That the distance between the
posts is 24-1/8”.
ü The post height is at least 15” from
the ground.
ü Tops of posts are level with each
other.
4 Locate conduit, as required.
5 Allow concrete to set at least two days
before installing power unit.
REAR OF GATE
OR BACKFRAME
FENCE LINE
9-1/2
4-1/2 24-1/8”
3” O.D.
15” MIN.
DEPTH AS
REQUIRED
BY LOCAL
CODES OR
BELOW
FROST
LINE
3” U-BOLTS
01-G0547F11
Figure 11
POST MOUNTING: SL590 ONLY
1 Locate and secure two posts, 3” O.D.
heavy wall pipe.
2 Check that:
ü Each post is the same distance
from the gate.
ü That the distance between the
posts is 24”.
ü The post height is at least 42” from
the ground.
ü Tops of posts are level with each
other.
3 Locate conduit, as required.
4 Allow concrete to set at least two days
before installing power unit.
REAR OF GATE
OR BACKFRAME
FENCE LINE
8-3/4
7-1/2
24”
MIN.
3” O.D.
42”-48”
DEPTH AS
REQUIRED
BY LOCAL
CODES OR
BELOW
FROST
LINE
01-G0547F12
Figure 12