Instruction Manual
 Page 3 of  9 
DB - 612 LIGHTBAR DIMMER 
 Version: 0.6  OWNERS MANUAL   01/20/2005 
www.lightronics.com 
Lightronics Inc                  509 Central Drive Virginia Beach, VA 23454               Tel 757 486 3588 
MOUNTING ADAPTER INSTALLATION 
DB - 612
LOCK 
WASHER
NUT
1/2" DIA. BOLT 
FLAT 
WASHER
PIPE CLAMP 
(NOT SUPPLIED 
MOUNTING 
A
DAPTER
T SLOT 
POWER REQUIREMENTS 
Each DB-612 requires both lines of a SINGLE PHASE 120/240 VOLT AC service at 30 Amps per line or THREE 
PHASE 120/208 VOLT AC service at 20 Amps per line. A neutral conductor is needed. The unit requires a line 
frequency of 60HZ. Power enters the DB-612 through the knockout sized holes in the left end of the unit. A 
terminal block for connecting the incoming power is located inside the left end of the unit. There is also an earth 
ground lug. 
The DB-612 will not operate correctly using only 2 phases of a 3 phase power service. This holds true 
regardless of whether the unit is set up for single or three phase power. 
INSTALLATION 
MAKE SURE THE INPUT POWER IS DISCONNECTED BEFORE INSTALLING THE DB-612. 
The DB-612 is supplied to operate on THREE PHASE 120/208 VAC power. It can be "field converted' to operate 
on SINGLE PHASE 120/240 VAC. See the section "SINGLE PHASE POWER CONNECTIONS" for information 
about converting to Single phase power. The power input terminals are rated for 3 AWG#10 wires, 4 AWG#12 
wires or 5 AWG#14 wires. Terminal torque is 16 lb-in max. 










