Switch User Manual

Lightwave Communications PC ServerSwitch 2x16
www.lightwavecom.com Page 24 of 24
8. When the PC ServerSwitch 2x16 has received the entire file, it will
prompt the user through the serial port to confirm that the file is
correct. Check the file version to be certain that it is the version that
you wish to upload to the PC ServerSwitch 2x16 system.
9. When ready to modify the flash, select 'y' for 'continue with
programming'. NOTE: DO NOT TURN THE POWER OFF at this
point.
10. The flash memory will be erased, and the new flash file will then be
saved.
11. You will get a prompt stating "Flash Programming Complete" after
less than a minute. Finally, it will state "Starting System".
12. After you get the Starting System prompt, the Flash update is
completed, and the 2x16 is ready to go. Simply disconnect your PC
from the CONTROL IN port, and return all connections to normal.
13. To verify that the System Flash has been updated, go to the Main
Menu, select the System Setup screen and see the version number
as listed on the screen.
Start XMODEM transfer of Dual PCServerSwitch flash memory
c c c c c c c c c c
Received: Dual PCServer Switch v2.25
Continue with programming? (y/n) y
Erasing the flash (takes about 10 sec.)
Programming FLASH ...........................................................
Flash programming complete.
Starting System.