Availability Example 1
In this example, one of the welders at Advanced Manufacturing was in the states listed in Table 14.1 during
the Morning shift on 08/02/2013.
Table 14.1 Data for Calculating the Availability Factor *
Time Stamp Status Duration Time in Planned Downtime Time Not in Planned Downtime
7:00 AM Faulted 2580 0 2580
7:00 AM Faulted 1015 0 1015
8:00 AM Faulted 3381 0 3381
8:00 AM Faulted 222 0 222
9:00 AM Faulted 143 0 143
9:00 AM Welding 20 0 20
9:00 AM Idle 0 0 0
9:00 AM Faulted 3190 0 3190
9:00 AM Welding 20 0 20
9:00 AM Idle 241 0 241
10:00 AM Idle 1971 0 1971
10:00 AM Welding 392 0 392
10:00 AM Faulted 1220 0 1220
11:00 AM Welding 455 0 455
11:00 AM Idle 1166 0 1166
11:00 AM Faulted 1981 601 1380
12:00 PM Faulted 3600 2999 601
1:00 PM Faulted 1600 0 1600
1:00 PM Welding 443 0 443
1:00 PM Idle 1562 0 1562
2:00 PM Idle 1982 0 1982
2:00 PM Faulted 1500 0 1500
2:00 PM Welding 119 0 119