Operating Instructions

4
Operation
38
id: GUID-EA774CD9-24F1-426A-927A-0E124FD5F33- version: 2 - lang: EN - srclang:
Checking the operational readiness of the Truck Unit
Check for operational readiness
1. Switch on the industrial truck.
2. The Truck Unit switches on and is ready
for operation after approx. 15 seconds.
Check LED (1) on the Truck Unit. The LED must
flash green.
Checking pairing with a Distance Beeper
If the driver is carrying a Distance Beeper, it
must be paired with the Truck Unit. This
prevents a signaling message from being
triggered.
Pairing is carried out automatically:
LED (2) lights up green:
Distance Beeper is paired and within range of the
Truck Unit.
LED (2) lights up red:
Distance Beeper is paired but not within range of
the Truck Unit.
Checking the operational readiness
sensors
The sensors must be ready for operation be-
fore work operations begin. Check LEDs 1 to 4
(1). LED 4 is optional and depends on the
number of sensors installed.
Switch on the industrial truck. The Truck
Unit switches on.
LEDs 1 to 4 light up green for ten seconds.
If the sensors are ready for operation, the
LEDs go out after ten seconds.
If a sensor is faulty, the corresponding LED
lights up red.
Faulty sensors cannot merely be replaced.
The sensors must be registered with the Truck
Unit system via the configurator.
Contact your authorized service partner for
advice.
NOTICE
WARNING
WARNING
1 2
3 4
1
2
1 2
3 4
1