Operating Instructions

4
Operation
40
Pre-shift checks
Functional test of the Static Unit
The functional test must be completed regard-
less of the industrial truck component
configuration. When using the Truck Unit
Small, per-
form the following steps as well.
The functional test checks the signaling zones
that have been set and any responses that
have been set on the industrial truck.
Switch on the industrial truck. The Truck
Unit switches on.
Check the operational readiness of the
Static Unit.
The "operating status" LED must flash green.
Drive the industrial truck to the signaling
zone. During this process, the driver
monitors the Truck Unit and any
responses that have been set on the
industrial truck. A second person
monitors the Static Unit (figure
LSG_0059).
Fault messages and irregularities on the Truck
Unit or the Static Unit during the test are not
permitted.
If necessary, have the signaling zones
and the truck settings set up again by the
service partner.
NOTICE
LSG_0059