Operating Instructions

Operation 4
Operating Instructions - X EN - 01/2020
41
Functional test of the Zone Marker
The functional test must be
completed regard- less of the
industrial truck component
configuration. When using the Truck
Unit Small, per
form the following
steps as well.
The functional test checks the
signaling zone that have been
configured and any responses that
have been set on the industrial truck.
Switch on the industrial truck.
The Truck Unit switches on.
Check the operational readiness
of the Zone Marker.
The "operating status" LED must
flash green.
Drive the industrial truck to the
signaling zone. During this
process, the driver monitors the
Truck Unit and any responses
that have been set on the
industrial truck. A second person
monitors the Zone Marker (figure
LSG_0060).
Fault messages and irregularities on
the Truck Unit or the Zone Marker
during the test are not permitted.
If necessary, have the signaling
zones and the truck settings set
up again by the serv- ice partner.
NOTICE
LSG_0060