BGUS /BGUS-D SG/SG-D INSTALLATION GUIDE BGUS BGUS-D SG SG-D Operator models contained in this manual conform to UL325 standard for use in Class I, II, III, and IV applications USA & Canada (800) 421-1587 & (800) 392-0123 (760) 438-7000 - Toll Free FAX (800) 468-1340 www.linearcorp.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE TABLE OF CONTENTS PRE-INSTALLATION INFORMATION Gate Operator Classifications ...................................................................................................................................... 3 Safety Information and Warnings ................................................................................................................................. 3 Pre-Installation Information .................................................
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE SAFETY INFORMATION AND WARNINGS GATE OPERATOR CLASSIFICATIONS All gate operators can be divided into one of four different classifications, depending on their design and usage. Read the following before beginning to install LINEAR barrier gates: Class I Residential Vehicular Gate Operator A vehicular gate operator intended for use in a home of one to four single family dwellings, or garage or parking area associated with these dwellings. 1.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE WIRING SPECIFICATIONS 1. Select from the chart at the bottom of this page corresponding to the model, voltage and horsepower rating of your operator. 6. Connect power in accordance with local codes. The green ground wire must be properly connected. 7. Wire insulation must be suitable to the application. 2. The distance shown on the chart is measured in feet from the operator to the power source. DO NOT EXCEED THE MAXIMUM DISTANCE.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MOUNTING INSTRUCTIONS BGUS/BGUS-D•SG/SG-D INSTALLATION ON CONCRETE CURB 1. Uncrate the gate. Avoid damaging the cabinet finish. 2. Leave the machine bolted to the bottom pallet until ready to install. 3. Open the cabinet door. 4. Remove the bolts holding the gate to its pallet and place the machine in position on the curb. Refer to your Equipment Layout (EL) drawing for proper positioning of your gate. 5.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE BARRIER GATE ARM INSTALLATION FOR MODEL BGUS/BGUS-D 1. Make sure the barrier gate is in the full closed position 2. With someone’s assistance, lift the arm (#2) up to a height even with the barrier gate flange. 3. Using the hardware (#3) provided, attach the arm to the flange and attachment channel (#1). Tighten all bolts firmly.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE BARRIER GATE ARM INSTALLATION FOR MODEL SG/SG-D 1. Assemble the SG arm on the ground first, making sure to leave all fasteners loose, including the spreader arms (#4 & #7 above). 4. Assemble the wood arm between the attachment channel (#8) and the flange and bolt together. Tighten these bolts firmly. 2. Make sure the barrier gate is in the full closed position. 5. Tighten all bolts where the three pieces of wood arm come together. 3.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE VENT PLUG INSTALLATION Gear reducers used in LINEAR gate operators will have pinned vent plugs installed prior to shipping in order to keep the oil from spilling out during transportation. During installation this pin should be removed to allow proper ventilation. See the illustrations below. OR LIMIT CAM ADJUSTMENTS The limit cams for all models of barrier gate operators have been pre-set at the factory for approximately 90 degrees of motion.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE CONTROL BOARD ADJUSTMENTS LIMIT SWITCH L.E.D.s LIMIT SWITCH CONNECTOR TERMINAL STRIP #1 CONNECTOR 3A FUSE oard rol B t n o C DC with rd r Boa Moto 2A FUSE TERMINAL STRIP #2 CONNECTOR DIAGNOSTIC L.E.D.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE TERMINAL CONNECTION DESCRIPTIONS TERMINALS FUNCTION DESCRIPTION OF FUNCTION 24VAC 24VAC N 24VAC Provides 24Volt AC power for accessories. Note: DC models will NOT have 24Volt AC power available. 24VDC+ 24VDC 24VDC- COMM. Provides 24Volt DC power for accessories. 1&4 OPEN Opens the operator. Several accessories such as button stations, keypads, transmitters and card readers can be wired to open. 3&4 CLOSE Closes the operator.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE CURRENT SENSING ADJUSTMENTS Because gates vary in construction and may have different force requirements in the open and close directions to move, the LINEAR control board has separate Multi-turn potentiometers for adjusting in both directions independently. The adjustment should be set light enough to maintain minimal force (40 lbs.) should an obstruction occur, but high enough to keep the gate moving under normal conditions without interruption.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE ONBOARD L.E.D. INDICATOR DESCRIPTIONS Control Board L.E.D. Indicators: OPEN This indicator is lit when an open signal is present. This signal can come from such devices as button stations, radio receivers, keypads and telephone entry systems. CLOSE This indicator is lit when a closed signal is present. This signal typically comes from three-button stations. STOP This indicator is lit when there is a break in the stop circuit.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE BGUS-D • SG-D CHARGER BOARD SLEEP MODE When primary AC power is not available, the operator will continue to operate in battery only mode if the charger board is set in its RUN mode (see Battery Backup Charger Configuration). Accessories wired into the operator will continue to draw power, even when the operator is not opening or closing the gate. This can dramatically reduce the amount of standby time available from the batteries.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS -14-
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS -15-
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS -16-
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE TROUBLESHOOTING Operator fails to start: A. If the operator has been running a large number of cycles, the motor may have gotten hot and tripped the overload. Allow the motor to cool down and press the overload reset button in bottom of motor. B. Make sure you have power at the master distribution panel and that the power has not been turned off. C. The secondary fuse on the control board may have blown.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL BGUS MECHANICAL PARTS EXPLODED VIEW -18-
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL Ref. No.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL BGUS-D MECHANICAL PARTS EXPLODED VIEW -20-
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL Ref. No.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL SG MECHANICAL PARTS EXPLODED VIEW -22-
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL SG MECHANICAL PARTS LIST Ref. No.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL SG-D MECHANICAL PARTS EXPLODED VIEW -24-
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL SG-D MECHANICAL PARTS LIST Ref. No.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL Ref. No.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODELS REF NO. BGUS/SG PART NO. DESCRIPTION 1 2 3 4 5 6 7 8 2100-1778 2100-1761 2100-1762 2300-735 2200-122 2500-1948 2510-303 2500-1946 2510-304 9 10 11 12 13 14 2520-444 2510-249 2510-250 2510-261 2500-071 2500-212 2500-791 Control Box Wrapper Terminal Strip Bracket, output side Terminal Strip Bracket, input side Heyco Bushing, 1.09 diameter Heyco Bushing, .
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL REF NO. 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 BGUS-D • SG-D PART NO. DESCRIPTION 2100-1778 2200-876 2100-1762 2100-1761 2200-122 2500-1948 2510-271 2500-1947 2510-247 2520-444 2510-249 2510-250 2500-071 2510-261 2300-696 2300-733 2300-734 2500-2127-CB Control Box Wrapper Plunger, Spring Loaded Terminal Strip Bracket, Input Side Terminal Strip Bracket, Output Side Heyco Bushing, .
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE BATTERY MAINTENANCE The gel-cell batteries in this operator require no routine maintenance. For assured continued performance, they should be replaced every year. If power is to be removed for one week or more, disconnect the negative wire from the batteries as this will prevent deep discharging. Fully charge before use after storage or upon initial installation.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE PREVENTATIVE MAINTENANCE IMPORTANT! • Always disconnect power from operator before servicing. • Keep clear of gate during operation. GENERAL: LINEAR gate operators are designed for many years of trouble-free operation and, under recommended operating conditions, will require only minimal maintenance. To ensure that your unit is ready for operation at all times--and to preclude serious damage or failure--inspect the unit systematically.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE 3sso Imperial Oil MATERIAL SAFETY DATA SHEET Date Prepared: February 02, 1996 Supersedes: January 07, 1995 MSDS Number: 225570 Cette fiche signaletique ast aussi disponible en francais 1. PRODUCT INFORMATION Product Identifier: ESSO GEAR OIL GX 80W-90 Application and Use: Premium quality multigrade extreme pressure gear oil for use in automotive applications including some manual transmissions.
USA & Canada (800) 421-1587 & (800) 392-0123 (760) 438-7000 - Toll Free FAX (800) 468-1340 www.linearcorp.