User Guide

EP Series User Programming Guide 32
Event Action
Event Action allows the operator to create events that are assigned to actions. For example, the operator may assign a time
schedule to an auxiliary output.
Adding an Event Action
1. Click New and enter a name and
description.
2. In the Basic section, name the
event, ll in a Description, and
select a Schedule for the time the
Event Action will be active.
Event
3. In the Event section, click Insert to
add a new event.
4. Choose the type of equipment that
can trigger the event action in the
Event Source Type dropdown.
5. Under Where, choose the event
source location(s) by selecting the
location(s) and clicking the right
arrow to move it to the eld on the
right.
6. Under Event, choose the event(s)
to monitor by selecting the event(s)
and clicking the right arrow to move
it to the eld on the right. This is the
event(s) that will trigger the action.
Action
7. In the Action section, click Insert.
8. Choose either Aux Output or
System for the Action Source Type.
Aux Output
This is the auxiliary relay(s) that will
respond to the event. Select them
and move it to the right by clicking
the right arrow.
System
These are various messages and
operations that the system can
perform if the Event Action triggers.
» NOTE: To have the system send an e-mail
for an event, use the Where dropdown and
select Send E-Mail.
9. Click Action Save and Save in
each section to save the settings.
To Add an Event Action
Click New
Action Triggers
Aux Output
Choose Where &
What Event
Action Triggers
System Event
Choose what the
Action will do
Enter Text for E-Mail and
Dashboard Messages