User Manual
Page
5. Insert the end mill into the drilling xture
bushing labeled as “B”.
6. Drill the new dowel hole until the bottom of
the set collar contacts the top of the drilling
xture.
7. Repeat steps 3-6 for the other cylinder head.
8. Throughly remove all drilling debris from the
valley tray and cylinder heads
9. Remove the tape from the cylinder head
ports.
Relocation of the LSA/LS9 cylinder head
dowel pins is now complete.
5.