User Guide

Network PTZ Camera·Quick Start Guide
26
Front View of Base PlateBase Plate on the Bottom of the Dome
OPEN
Figure 2-38 For DE2xxxI Series (IR) PTZ Camera
2. Attach the drill template (supplied) to the place where you want
to fix the PTZ camera, and make sure the front arrow appoints to
the monitoring area.
3. Insert two PM4×10 screws into the ceiling, as shown in Figure
2-39.
Figure 2-39 Attach the Drill Template
4. Attach the junction box to the ceiling and secure it by aligning the
holes with two screws and rotating the junction box according to
the direction as shown in Figure 2-40. Make sure the front arrows