Installation Sheet

5
LED VOLUMETRIC RETROFIT
INSTALLATION
Section 1
3. Push the frame up and flush on the opposite side.
4. Rotate the mounting cams on the frame (2) to the
engaged position. The mounting cams should be flush
to the T-rail grid cams and be resting on top of drop
ceiling “T” grid. The frame is now installed. Inspect
installed frame to ensure the gaps from side to side
are even.
2. Locate the stationary mounting tabs on the frame (2).
Insert these tabs, on top of the grid ceiling “T” rail, and
beneath the troffer.