Use and Care Manual

Precut Value Shed Manual
Gambrel Barn
Construction Manual © 2008-2009 Little Cottage Co. Page 18
103
104
105 106
107
108
Continue with the latch.
Next you are going to install the drip edge.
This will be fastened with 3/4” nails.
Fasten with 3/4” nails about every 12” along
the entire edge of the building.
As you secure the drip edge, you will need to
snip the drip edge to allow to bend along the
ridge.
Continue to install the drip edge.
Now, snap a chalk line along the OSB consis-
tent with the width of the starter strip. Consult
the instructions provided with your shingle
package.