Use and Care Manual

Precut Value Shed Manual
Workshop & Gable
Construction Manual © 2008-2009 Little Cottage Co. Page 12
67
68
69 70
71
72
Make sure the trusses are 24” o.c. before fas-
tening sheeting.
Next install the drip edge as shown.
Continue with drip edge.
Use the tin snips to cut drip edge so it will
bend.
Measure 6” over the drip edge and snap a chalk
line as shown for starter strips.
Install the rst starter strip as shown.