Use and Care Manual
Precut Value Shed Manual
Workshop & Gable
Construction Manual © 2008-2009 Little Cottage Co. Page 3
13
14
15 16
17
18
Next make sure top is ush with 2x4 and fasten
with 2” nails.
Make sure outside corner is ush as shown before
fastening.
Continue with Smartside siding installation.
Fasten header piece with 2” nails as shown in
picture before.
Next install door stops as shown. Keep ush
with the top of 2x4 not Smartside and secure with
2” nails.
Install the trim block in the center of the header
and secure with 2” nails.