Installation Manual

ASSEMBLING & INSTALLATION INSTRUCTIONS PRODUCT# 50874 50875
WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER .
ASSEMBLING THE FIXTURE (Fig.1)
1. Shut off the power at the circuit breaker box. Remove old
fixture and all hardware from Junction Box. The junction box
is not include.
2. Carefully unpack your new fixture and lay out all the parts on a
clear area. Take care not to lose any small parts necessary for
installation.
3. Slide the electrical wires through the tubes(E)/(D)/(C)/(B) and
canopy(A) .
4. Raise the tube (E) to top screw pipe of shade (F), raise the tube
(D) ,tube (C) ,tube (B) and canopy(A) to the screw pipe in
order , then by turning it clockwise until tight.
5. Thread the pipe nipple(G) into the bottom center coupling of the
lamp holder and lock it securely with the hex nut. Thread lock
hex nut onto the end of the pipe nipple.
6. Install the light bulbs in accordance with the fixture
specifications NOTE: DO NOT EXCEED THE SPECIFIED
WATTAGE!
7. Raise the steel shim(H) and acrylic plate(I) to bottom of the
shade, aligning the hole with pipe nipple and lock it securely
with the finial (J).
8. Thread the two box screws into the pre-drilled holes in the
Mounting plate spaced the same distance apart as the holes in
the canopy (A).
9. Attach the Mounting plate to the Junction Box with the two
Junction Box screws as shown. The side of the Mounting plate
marked "GND" must face to out.
10. While holding the fixture lamp towards the ceiling , connect
the electrical wires as Shown in Fig.2, making sure that all wire
nuts are secured. You may have to wrap the connections with
electrical tape. If your outlet has a ground wire (green or bare
copper), connect the fixture ground wire to it. Otherwise
connect fixture’s ground wire directly to the Mounting plate
with the green screw provided. After wires are connected, tuck
them carefully inside the Junction Box.
11. Raise the canopy (A) on to the Junction box, aligning screws
on mounting plate with mounting holes in canopy and lock it
securely with the ball nuts.
Your installation is now complete Return power to the
junction box and test the fixture.
Fig.1
G
J
M
o
u
n
t
i
n
g
p
l
a
t
e
M
o
u
n
t
i
n
g
s
c
r
e
w
F
i
x
t
u
r
e
J
u
n
c
t
i
o
n
B
o
x
(
N
o
t
i
n
c
l
u
d
e
)
Ground Wire
Ground Wire
Fig.2
DOC20141250874
White or
HOUSE
Black
WIRES
(Hot)
Smooth
FIXTURE
WIRES
Black or
Ribbed
WIRES
FIXTURE
Bare Copper(Ground)
FIXTURE
WIRES
Copper
(Ground)
HOUSE
(Neutral)
WIRES
White
Bare
Green or
WIRES
HOUSE

Summary of content (1 pages)