Installation Guide

+1 850 296 2377 Working hours : Mon - Fri 9:00 a.m. - 16:00 p.m. EST support@ihomeangel.com
www.ihomeangel.com Page: - 3 - / 5
Step A1: Thread the single bar(C) over the nipple (E) a minimum of 6 mm (1/4”). At this point need note that: the
side of single bar marked "GND" must face to the down.
Step A2:Thread the hex nut (B)onto the nipple (E) till snug
Step A3:Thread the collar loop (H) onto the nipple (E).
Step B1: Thread the tube (O)onto the bottom of trim(M) .
Thread the lower arm (R) onto the tube (O) .
Step B2: Fix the iron net shade (Q) and upper arm (N) with ball nut (p).
3. Make pre-installation
Step C1: By measuring, determine the correct number of links needed for proper hanging height. Using the chain pliers,