Installation Instructions

TRIM & FASCIA 190, 440, 540 & 2000 SERIES
APPLICATION
INSTRUCTIONS
Trim ends may lightly touch adjacent trim edges around windows and doors only. Re-prime and paint all cut ends.
When installing trim around windows and over window anges, be sure to follow the window manufacturers installation instructions.
• All openings must be properly sealed and ashed in a manner that prevents moisture intrusion or buildup. Flashing may be sealed to the
water-resistive barrier by using adhesive ashing or housewrap tape. (See ALL diagrams)
When trim is installed adjoining vinyl siding, install Z-ashing with a 4 inch upper leg between horizontal trim and J-channel.
(See diagram 8a)
• Horizontal trim or bands shall be ashed with a sloped metal Z-ashing to redirect water away from the wall assembly.
INSTALLATION
WINDOWS, DOORS AND OPENINGS
7c
7d
Housewrap
Flap
Housewrap
Tape
7e
7a
7b
Adhesive
Flashing
Sealant
3/16” min.
space
Z-Flashing
Sealant
3/16” min. space
Shim
window and
door trim so
it is installed
on level wall
plane
2 nails
24” o.c. min.
Sealant
3/16” min. space
Z-Flashing
3/8” min. space
(do not caulk)
Head Flashing
Jamb Flashing
Sill Flashing
Window
Flange
WRB
Siding
Adhesive
Flashing
Z-Flashing
3/8” min. space
Z-Flashing
3/8” min. space
Shim
Trim
Top of
window
Bottom of
window
Sealant
3/16” min. space
Shim
Trim
Sill Flashing
Sealant
3/16” min. space
WRB
Siding
7