Installation Instructions
TRIM & FASCIA           190, 440, 540 & 2000 SERIES
INSTALLATION
• Trim ends may lightly touch adjacent trim edges around windows and doors only. Seal all cut ends exposed to the weather.
• When installing trim around windows and over window anges, be sure to follow the window manufacturer’s installation 
instructions. 
• All openings must be properly sealed and ashed in a manner that prevents moisture intrusion or buildup. Flashing may be 
sealed to the water-resistive barrier by using adhesive ashing or housewrap tape.  (See ALL diagrams)
• When trim is installed adjoining vinyl siding, install Z-ashing with a 4 inch (102 mm) upper leg between horizontal trim and 
utility trim or J-channel. (See diagram 8a)
• Horizontal trim or bands shall be ashed with a sloped metal Z-ashing to redirect water away from the wall assembly.
GENERAL REQUIREMENTS (CONTINUED)
7a
7b
Nails 
24” o.c. max.
Windows, Doors and Openings
Z-Flashing 
(do not caulk)
Adhesive 
Flashing
Shim 
window and 
door trim so 
it is installed 
on level wall 
plane
7c
Housewrap 
Tape
Window 
Flange
Housewrap 
Flap
Head Flashing
Jamb Flashing
Sill Flashing
Sealant 
3/16” min. 
space
Sealant 
3/16” min. space
Sealant 
3/16” min. 
space
Z-Flashing 
3/8” min. space 
(do not caulk)
WRB
Siding
Z-Flashing 
3/8” min. space 
(do not caulk)
Shim
Adhesive 
Flashing
Top of Window
Trim
Z-Flashing 
3/8” min. space 
(do not caulk)
WRB
Siding
Shim
Sill Flashing
Bottom of Window
Trim
Sealant 
3/16” min. space
Sealant 
3/16” min. space
7d
7e
LP SmartSide Trim & Fascia 
7










