user manual

DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-667test synchronization
8
For the following output example, assume that the port in cabinet 1, carrier c, slot
7, circuit 1 is an analog port and extension 81902 is connected to that port. The
command that was entered was "test station 81902".
Feature Interactions
None.
test synchronization
This command updates all the boards involved with synchronization.
Synopsis
test synchronization
[ short | long ][ repeat number | clear ] schedule
Permissions
The following default logins may execute this command: system technician,
inads, init.
Test No The actual test that is being executed.
Result The result of the individual test -"PASS," "ABORT," "FAIL," "NO
BOARD," "DISABLED," "EXTRA BD."
Error Code A system-generated number that tells why the release failed or
aborted. A detailed list of the codes according to "Test No." is
provided for each MO.
test station 81902 short
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01C0701 ANL-LINE 35 PASS
01C0701 ANL-LINE 48 PASS
01C0701 ANL-LINE 36 PASS
Command Successfully Completed