User's Manual
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r 
555-233-115 
Issue 1
April 2000
Upgrading R5r/R6r/R7r to R8r without Adding Memory 
2-13Upgrade the software and hardware 
2
.
Figure 2-3. Do not touch the disk inside the cartridge.
Power Up the Processor Carrier
1. To restore power to the processor carrier, insert the power plug on the 
right side
 of the carrier then insert the power plug on the 
left side
 of the 
carrier.
If high or critical reliability:
2. Monitor the SPE as it reboots by observing the LEDs and the terminal. It is 
powered up when the YELLOW LED on the Processor circuit pack blinks 
in a steady state, which takes about 10 minutes.
Unlock the Active SPE (H/C only)
1. Move the SPE SELECT switches to the AUTO position 
one at a time
.
2. Wait 10 minutes.
!
CAUTION:
Allow 10 minutes after unlocking to make sure the standby SPE has 
fully returned to service.
640
M
B
2
04
8
B
Y
T
E
S
/S
E
C
T
O
R
h1dfdsk1 KLC 091799










