Installation Guide

Table Of Contents
4
Step 5
Step 6
1
COLD
HOT
COLD
HOT
Congratulations! You’ve successfully finished installing your new faucet. For troubleshooting questions or
concerns, please reference the Owner’s Manual or visit our website at www.lulani.com.
We value your opinion! Don’t forget to leave us a review.
Connect the water supply lines to the hot
and cold water valves. Tighten with an
adjustable wrench. Do not over tighten.
Remove the aerator with an aerator wrench
(a quarter or flat surface tool could also work).
Turn the faucet handle all the way on, turn on
the hot and cold water supply and flush water
lines for one minute. Reinstall the aerator with
an aerator wrench.
Check all connections on the faucet and pipes
for leaks. Re-tighten if necessary.