Service Manual User guide
Table Of Contents
- 10709790_B_644B,6K,844C,8K,1044C,10K_Lull_Service_Mnl
- Quick Reference
- Revision Record
- Table Of Contents
- List Of Figures
- List Of Tables
- Section 1 Safety
- Section 2 Identification & Specifications
- Section 3 General Maintenance
- Section 4 Reference Diagrams
- Section 5 Supply, Pressure & Return Hydraulics
- Section 6 Boom & Transfer
- Section 7 Frame Tilt & Oscillation
- Section 8 Transmission
- Section 9 Brakes
- Section 10 Outriggers

Boom and Transfer
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
6-93
Fig. 6-92: Upper Shim Installation – Front of 3-Section Boom
5. (Ref. Fig. 6-92) Install/remove shim(s) under the indicated pads to
obtain specified clearances.
Fig. 6-93: Boom Section Gaps – Rear of 3-Section Boom
J1058
0.063"–0.125"
(1/16"–1/8") gap
between boom
and pad
0.063"–0.125"
(1/16"–1/8") gap
between boom
and pad
Install shim(s) under
these pads
J1059
1.063"–1.125"
(1 1/16"– 1 1/8")
This dimension
cannot be adjusted