Service Manual User guide
Table Of Contents
- 10709790_B_644B,6K,844C,8K,1044C,10K_Lull_Service_Mnl
- Quick Reference
- Revision Record
- Table Of Contents
- List Of Figures
- List Of Tables
- Section 1 Safety
- Section 2 Identification & Specifications
- Section 3 General Maintenance
- Section 4 Reference Diagrams
- Section 5 Supply, Pressure & Return Hydraulics
- Section 6 Boom & Transfer
- Section 7 Frame Tilt & Oscillation
- Section 8 Transmission
- Section 9 Brakes
- Section 10 Outriggers

Boom and Transfer
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
6-105
13. (Ref. Fig. 6-109) Remove six (6) capscrews (Item 3) and lockwashers
(Item 4) securing the anchor base (Item 2) to the outer boom section
(Item 1).
Fig. 6-110: Lower Chain Adjustment Rod
14. (Ref. Fig. 6-110) Remove capscrew (Item 2) and lockwasher (Item 3).
Remove chain adjustment rod (Item 4) by turning counterclockwise
until free. Remove the anchor base (Item 1).
J1094
# Description
1 Anchor Base
2 Capscrew
# Description
3 Lockwasher
4 Chain Adjustment Rod
1
2
3
4