Service Manual User guide
Table Of Contents
- 10709790_B_644B,6K,844C,8K,1044C,10K_Lull_Service_Mnl
- Quick Reference
- Revision Record
- Table Of Contents
- List Of Figures
- List Of Tables
- Section 1 Safety
- Section 2 Identification & Specifications
- Section 3 General Maintenance
- Section 4 Reference Diagrams
- Section 5 Supply, Pressure & Return Hydraulics
- Section 6 Boom & Transfer
- Section 7 Frame Tilt & Oscillation
- Section 8 Transmission
- Section 9 Brakes
- Section 10 Outriggers

Boom and Transfer
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
6-197
Fig. 6-210: Slide Pad Installation – Inner Boom Section
26. (Ref. Fig. 6-210) After applying thread locking compound to the
capscrews, install two (2) lower and two (2) side slide pads (Items 1
and 2) on inner boom section according to drawing specifications with
lockwashers (Item 3) and capscrews (Item 4). Torque capscrews to
180 in-lbs.
Fig. 6-211: Grease Hose Installation
27. (Ref. Fig. 6-211) Install grease hose assembly on rear of inner boom
section as follows:
a. Install two (2) elbows (Item 3) on inside of inner boom section
making sure elbows are in correct position for grease hose to be
connected.
J1247
1
2
3
4
4
3
# Description
1 Lower Slide Pad
2 Side Slide Pad
# Description
3 Lockwasher
4 Button-Head Socket Capscrew
J1235
3
5
1
4
6
2
# Description
1 Grease Hose
2 Inner Boom Section
3Elbow
# Description
4 Bulkhead Adapter
5 Grease Fitting
6 Grease Fitting Cover