Service Manual User guide
Table Of Contents
- 10709790_B_644B,6K,844C,8K,1044C,10K_Lull_Service_Mnl
- Quick Reference
- Revision Record
- Table Of Contents
- List Of Figures
- List Of Tables
- Section 1 Safety
- Section 2 Identification & Specifications
- Section 3 General Maintenance
- Section 4 Reference Diagrams
- Section 5 Supply, Pressure & Return Hydraulics
- Section 6 Boom & Transfer
- Section 7 Frame Tilt & Oscillation
- Section 8 Transmission
- Section 9 Brakes
- Section 10 Outriggers

Boom and Transfer
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
6-199
Fig. 6-213: Upper Slide Pad Installation – Front of Middle (Forward) Boom
Section
31. (Ref. Fig. 6-213) After applying thread locking compound to the
capscrews, install two (2) upper slide pads (Item 4) and shims (Item 3)
on front of middle (forward) boom section with lockwashers (Item 2)
and capscrews (Item 1) according to drawing specifications. Torque
capscrews to 180 in-lbs.
32. Lift middle (forward) and inner boom sections and slide them into
middle (rear) boom section.
Fig. 6-214: Upper Chain and Hose Reel Assembly – Middle (Forward) Boom
J1245
1
2
3
4
# Description
1 Button-Head Socket Capscrew
2 Lockwasher
# Description
3Shim
4 Front Upper Slide Pad
J1244
7
8
9
10
1
2
2
3
6
5
4
# Description
1 Upper Chains
2Lock Nut
3 Upper Chain Anchor
4 Capscrew
5 Lockwasher
# Description
6 Chain Anchor Rod
7 Hose Reel
8Capscrew
9 Lockwasher
10 Hose Reel Pin