Service Manual User guide
Table Of Contents
- 10709790_B_644B,6K,844C,8K,1044C,10K_Lull_Service_Mnl
- Quick Reference
- Revision Record
- Table Of Contents
- List Of Figures
- List Of Tables
- Section 1 Safety
- Section 2 Identification & Specifications
- Section 3 General Maintenance
- Section 4 Reference Diagrams
- Section 5 Supply, Pressure & Return Hydraulics
- Section 6 Boom & Transfer
- Section 7 Frame Tilt & Oscillation
- Section 8 Transmission
- Section 9 Brakes
- Section 10 Outriggers

General Maintenance
Service Manual — Models 644B, 6K, 844C, 8K, 1044C, 10K
3-15
Pipe Thread Fittings
To install National Pipe Thread (NPT) fittings:
1. Apply sealant sparingly to male pipe threads only, avoiding the first few
threads at the end of the fitting.
Note:
Do not use Teflon tape or excessive amounts of sealant. System
contamination will result.
2. Install fitting and tighten per Table 3-11.
Table 3-11: Pipe Thread Fittings (Steel)
Jump Starting Procedures
CAUTION:
• Improper jump starting procedures can cause an explosion resulting in
personal injury.
• Sparks near batteries can cause explosions.
• Do not allow jump cable ends to touch each other or the machine.
• Battery acid can cause personal injury if it contacts skin or eyes.
Always wear eye protection when jump starting a machine.
• Always connect battery positive (+) to battery positive (+) and battery
negative (-) to ground on the machine. Make the final ground connec-
tion away from the battery.
• Allowing the two machines to touch during jump starting can cause
damage to bearings and electrical circuits.
• This machine has a 12 volt starting system. Use the same voltage (12
volts) for jump starting. Use of higher voltage can damage the electri-
cal system.
• Never charge a frozen battery.
Fitting
Size
Thread Size
(NPT)
Turns
1
1.Turns past finger tight
-2 1/8-27 2–3
-4 1/8-27 2–3
-6 1/4-18 1.5–3
-8 3/8-18 2–3
-10 1/2-14 2–3
-12 3/4-14 2–3
-16 1-11.5 1.5–2.5
-20 1 1/4-11.5 1.5–2.5
-24 1 1/2-11.5 1.5–2.5