Instructions / Assembly

4
FTF01 Rev.1 042018Luxier
Installation
1. Connect hot and cold SUPPLY HOSES (5) into
the manifold using an adjustable wrench. Make
sure the connections are tight, use PTFE tape if
needed. Insert the RISER TUBE (1) over hot and
cold SUPPLY HOSES (5). Connect the RISER TUBE
(1) into base of the VALVE BODY (2) and tighten
fully.Slide the FLOOR MOUNTING FLANGE (3) onto
the RISER TUBE with the ange (4). Thread RISER
TUBE (4) into the bottom of RISER TUBE (1) and
fully tighten.
3. Make sure the oor is level in both directions.
Determine the distance from the nished wall to
the center of the oor water supply hose. Mark the
centerline. Drill a 2” (51mm) diameter hole for the
Hot and Cold water supply hoses.
Insert the water supply hoses through the hole and
place Tub Filler Assembly on the oor and check for
alignment.
Install SPOUT (1) into faucet body (2) tighten
Setscrew (3) with the supplied small hex wrench
supplied. Insert Handle (4) on the cartridge stem,
tighten the Setscrew (5) and install Cap (6) to the
Handle (4) .
HOT
COLD
hot inlet
cold inlet
hot water supply
cold water supply
5
5
1
2
4
3
1
1
3
4
5
6
2
Cartridge Stem
2
Level
BASE BOARD
2" Hole
FINISHED WALL LINE
COLD
HOT
Top View
3