Operation Manual

LX90xx system Version 4.0 February 2014
Page 16 of 151
4 Installation
The main display unit is installed in an aperture 93.5 mm wide and 81.5 mm high. The vario
unit and any additional vario indicators each require a standard 57 mm cut-out or standard
80 mm cut out.
4.1 Installing the main display unit
Prepare the cut-out in the instrument panel according to the drilling template. Position the
Main display unit in the cut-out in the instrument panel. Tighten the main display unit with
attached 2.5 mm screws.
When installing the main display unit it is not necessary to remove the rotary
knobs.
The mounting template for LX9000 main display unit is shown in the picture below (not to
scale!):
The mounting template for LX9070 main display unit is shown in the picture below (not to
scale!):