Installation Guide

12
|
SEDONA ISlAND ASSEmbly INStructIONS
The LP Tank retention device can be secured to the door
frame with two bolts (Part No. 6) and washers (Part No. 1).
The LP tank is rested in the retainer and the nger screws
(Part No. 7) are tightened at the base of the tank securing
it into position.
Connect the hose and regulator to the LP cylinder. Make
sure all of the burner knobs are in the OFF position.
SEDONA ISLAND ASSEMBLY INSTRUCTIONS
Step 12
Make a solution of 1 part liquid dish soap and 3 parts water
being careful not to shake the solution.
Open the LP Cylinder and using a brush or spray
bottle, apply the solution to all ttings at the stainless
steel connector, the Tee tting, the regulator and hose
connections. Wait a moment and check for the formation
of bubbles. Bubbles will indicate a gas leak that must be
repaired before continuing.
Step 13
Install the refrigerator and level it according to the
refrigerator instructions. Route the power cord to the outlet
in the rear panel, but do not plug it in. You must wait 2-3
hours before plugging it into the outlet on the rear inside
panel of the island.
Step 14
Installing the LP Tank
Leak Test All Fittings
Install the Refrigerator
DO NOT CHECK FOR LEAKS
WITH AN OPEN FLAME!
WARNING